Тематическое исследование

Zero emissions, maximum comfort, Gijón, Asturias, Spain

Zero emissions, maximum comfort

Greenspace PCTG in Asturias, Spain, is the first net-zero energy office building in the region and one of the few of its kind in the whole country. An impressive achievement made possible by a combination of highly efficient active energy and passive systems. Spanish architects EMASE Arquitectura worked with engineering firm SvR Ingenieros to create a sustainable, environmentally friendly design. It uses solar panels for keeping solar loads out of the building on one hand and to generate more energy than the building consumes on the other hand. In order to minimise the building’s energy use, the project partners turned to Uponor and its thermally active building systems (TABS) for heating and cooling.

Факты:

Gijón, Asturias, Spain
Офисные здания
Площадь: 1,500 square metres
Лучистое отопление и охлаждение
завершение: 2020
Количество этажей: 3

Участие Uponor

Thermally active building systems (TABS) with 7,500 metres of Uponor Comfort Pipe PLUS pipes
Support with HEAT2 simulation software from Uponor to find out best way to use TABS within the building

Between the basement, the three above-ground floors and the roof, Greenspace covers a total area of 1,500 square metres. Since it was opened in Gijón Technology Park in July 2020, it has hosted a range of start-ups and other companies with a focus on innovation and digital technology.

 

Minimising energy consumption

Greenspace has a positive energy balance: this means the building generates more power than it uses thanks to extremely efficient active and passive energy systems. The passive systems include, for example, insulation or natural lighting. The active systems involve the solar panels, the indoor climate solutions through the TABS and the radiant floor heating, as well as the monitoring and control of the building services.

Uponor provided the thermally active building system (TABS) which makes use of the thermal inertia of the building’s concrete structures. A network of 7,500 metres of Uponor Comfort Pipe PLUS was built into the structure of the building, using concrete core activation to store and release both heat and cold. The pipes carry water for the building’s heating and cooling systems and provide comfortable temperatures all year round. With the HEAT2 simulation software from Uponor, the project partners in Gijón were able to analyse the building’s static and dynamic thermal behaviour over time. This was the key to finding out the best way to use TABS.
 

Internationally certified

The energy concept includes much more, for example 134 solar panels, a lift that uses the energy of this panels or low-energy LED bulbs, controlled by intelligent sensors. The result of all these measures: a very pleasant working environment fostering creative thinking and high productivity. The range of energy efficiency and bioclimatic design measures employed, together with the use of renewable energy, healthy architecture, and low-emission materials, has seen Greenspace earn gold certification from LEED. This certification places Greenspace among the most sustainable buildings in the world.

“We needed a heating and cooling system that was tailored to the building structure while also being energy-efficient enough to fit in with our energy calculations and hydraulic design requirements,” says Ramón van Riet from SvR Ingenieros.

Zero emissions, maximum comfort

Greenspace PCTG net-zero energy building

Информация о проекте

Информация о проекте

Адрес
Parque Cientifico Tecnologico de Gijón
Страна
Spain
завершение
2020
Тип проекта
Новое здание
Тип здания
Офисные здания
Линейки продукции
Uponor Contec

Партнеры

"With the support of Uponor's technology, EMASE Arquitectura and SvR Ingenieros were able to determine the ideal size for the solar panels and enery distributions systems." Ramón van Riet, SvR Ingenieros.

 

Партнеры

Architects: Emase Arquitectura, Madrid
https://www.emase.info/

Consultancy and LEED certification: Arup, Madrid
https://www.arup.com/

Project management and LEED commissioning: SvR ingenieros, Asturias
http://www.svringenieros.es/

Promoter: GesyGes Innovación en la Edificación

Подобные проекты

Gazoil Plaza

Gazoil Plaza

"Газойл Плаза" расположена на юго-западе Москвы в непосредственной близости от штаб - квартир ОАО "Газпром" и ЗАО "Газпромбанк".
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria.