Reservoir tank for unordinary village of Tuuri, Alavus, Finland
Securing safe water distribution
Projektfakta
Uponors roll
Water consumption doubles in the summer
From the viewpoint of the Alavus water utility, the growth of the Kyläkauppa area in Tuuri has meant repeated measuring reviews on their water supply network. The water comes from two intake facilities, which are located about 10 and 15 kilometres from the village. If one line would fail, the other line could supply enough water – provided, that they were lucky enough. If such failure took place in the middle of the summer, a shortage of water would be a very likely scenario.
“Summer brings big crowds to the area, and the water consumption can be as high as 300 cubic metres per day. On the other hand, 130 cubic metres per day is more than enough in winter”, says Plant Manager Timo Seppä from the Alavus water utility.
“The Tuuri area has grown rapidly over the last ten years and continues to grow. We decided to install two 100-cubic-metre low water tanks on the area to balance consumption peaks and help in preparing for potential failures.”
Ready from the factory
Before making the decision to purchase the low water tanks, the water utility studied other options. These included, for example, increasing the size of the supply lines, but soon it was clear that storing the water is the way to go. Seppä had cost estimates calculated for both concrete and plastic tanks.
“It turned out that plastic is more cost-effective than concrete. Following a competitive tendering, Uponor won the contract, and they built the tanks and a pressure boosting station ready for installation at their factory.”
Both the tanks and the pressure boosting station were made from Weholite polyethylene pipe with an inner diameter of 2.4 metres. The length of each tank is 23.4 metres.
Straight into the trench
Uponor delivered the products to the site in Tuuri in September 2020. The Alavus water utility had commissioned the necessary excavation work and the construction of foundations, on which the tanks and the pressure boosting station were lifted and anchored by Uponor’s installation team. After the anchoring was completed, the water utility connected the tanks to the pressure boosting station and water supply network and filled the trench. Now the only things that are visible above ground are three manhole covers and two control cabinets for the electrical and automation systems.
“Installation was quick and smooth. The inlet and outlet fittings were exactly where they supposed to be, so it was easy for us to fit the pipes and valves between them.”
During the winter, the water utility’s own team continued to install the electrical and automation systems, and a decision was made to postpone commissioning so that it will take place closer to the summer, the high season of Tuuri. By that time, the installation of the remote monitoring of the tanks and the pressure boosting station will also be completed.
Projektinformation
Projektinformation
Liknande projekt
Storsatsning vid Skånes universitetssjukhus i Malmö
Testinstallation av infrakulvert med stor potential
Starkt, säkert och flexibelt
Innovativt - Pålitligt - och installerad på 11 dagar
Uponor markavloppssystem Ultra Rib 2 i Kungälv
Säkert och Hållbart
Infrakulvert Vallastaden
Fokus på framtida hållbarhet
Weholite installerat i Valdemarsvik
Uponor Vault renar dagvatten
ProFuse installerat i Borås Stad
Första installationen av Ultra Rib 2 Blue
Dagvattenmagasin i Järvastaden
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
An easy and reliable storm water solution
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Water treatment plant
Quick installation in the Konotopa channel
Super-sized cooling
Weholite tanks have multiple uses
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.