Sea outlet of treated wastewater, Swarzewo, Poland
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland. Like other projects aiming to make local water and sewer systems compliant with strict EU standards, the success of this project also depended heavily upon the quality of the materials used, as well as the reduction of cost and construction time. The use of WehoPipe PE-HD pipes made it possible to fulfil all of the requirements.
Projektfakta
Uponors roll
Underwater pipeline – a sea outlet is part of a larger ecological project in the region of the Baltic Sea, called "Final reorganisation of waste management in the agglomeration of Puck", associated also with the extension of the wastewater treatment plant, extension of the sewerage in Swarzew, and discharge of treated sewage into the sea. The investment is intended to protect the inshore land and waters of the Baltic Sea using controlled discharge of waste which has parameters required by the law and to enhance the investment and tourist potential of Puck, Władysławowo and the neighbouring areas.
For the project, Uponor Infra manufactured nearly 1.2 km or PE pipes – WehoPipe PE 100 SDR 22 DN 710. The pipes were delivered in 15-metre sections and then butt-welded on the wharf of the contractor. The contract also obliged the company to provide welding machines and installation crew, who made most of the joints including a non-standard fitting (diffuser). The next step was the installation of concrete blocks on the pipeline to facilitate the sinking operation. The weight of the blocks was so designed that the collector, filled with water, was safely placed on the riverbed. The discharge pipeline was towed by tugboat to the installation place and submerged.
Uponor Infra has been delivering for years the pipe systems to discharge the treated wastewater deep into the sea. At present the sea outlets are a standard solution and are very popular in Europe. They used to be made from steel, but along with the development of new materials this type of pipelines are now practically made only in PE technology. Polyethylene pipes are flexible, which makes them easily adaptable in various soil conditions and increases their resistance to vibrations, load and soil movement. Due to their low weight, PE pipes are easy and quick to install. They can be manufactured in considerably longer lengths than traditional pipes, which significantly shortens the installation time. What’s more, polyethylene pipes have superior chemical resistance and don’t corrode, which is a key factor when it comes to applications in salt water. For this reason polyethylene gained a worldwide recognition as the best material for the construction of low pressure underwater pipelines or the transport of water and sewage.Projektinformation
Projektinformation
Samarbete
Designer:
AQUAPROJEKT Gdańsk
Investor:
Spółka Wodno-Ściekowa Swarzewo
Contractor:
PRCiP Sp. z o.o. Gdańsk
Liknande projekt
Storsatsning vid Skånes universitetssjukhus i Malmö
Testinstallation av infrakulvert med stor potential
Starkt, säkert och flexibelt
Innovativt - Pålitligt - och installerad på 11 dagar
Uponor markavloppssystem Ultra Rib 2 i Kungälv
Säkert och Hållbart
Infrakulvert Vallastaden
Fokus på framtida hållbarhet
Weholite installerat i Valdemarsvik
Uponor Vault renar dagvatten
ProFuse installerat i Borås Stad
Första installationen av Ultra Rib 2 Blue
Dagvattenmagasin i Järvastaden
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
An easy and reliable storm water solution
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Water treatment plant
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.