Weholite tanks have multiple uses, Kuhmo, Finland
Weholite tanks have multiple uses
Durable and light Weholite tanks are easy to handle and can be sized and equipped for various purposes. Weholite is used for manufacturing products such as potable water, firewater, stormwater and chemical tanks, alkalisation plants, retention tanks, and separators. Weholite alkalisation plants use limestone, which guarantees an even and safe result.
Projektfakta
Uponors roll
With their layered construction, Weholite pipes are durable, flexible and light. They are manufactured from PE or PP profile using spiral seams. Thanks to the structure of the Weholite pipe material, tanks can be built with a diameter of over three metres.
Weholite can be used for manufacturing complete pipe and tank systems and highly versatile customised solutions. ”When used in tanks, Weholite is durable, watertight, light and hygienic,” emphasises Anders Andtbacka, product manager at Uponor Infra. Weholite is used for manufacturing products such as potable water, chemical, stormwater and alkalisation tanks. The tanks are always customised to meet the customer’s needs.
”There is no risk of corrosion in the case of a plastic tank, which can withstand almost all chemicals.” In addition, Weholite tanks are often delivered for industrial use.
Nothing from the tanks themselves dissolves into whatever the tank contains, or into the environment. Andtbacka points out that the other benefits of Weholite include fast and easy installation and commissioning. Weholite is light to handle, which speeds up the installation and commissioning of a tank. ”The system is built in the factory, ready for installation. This significantly reduces the amount of work and time spent at the installation site.”
Clean water in all conditions
A new groundwater intake facility is being built in Kuhmo, which is located in Eastern Finland near the Russian border. A Weholite alkalisation plant, including a pumping station, will be installed alongside the facility. In Kuhmo, this project is regarded as a key investment for the future.
The project also includes the construction of a potable water pipeline and transfer sewer line to the centre of Kuhmo, around ten kilometres from the new water intake facility. According to project engineer Timo Piirainen from the City of Kuhmo’s water services, the project is above all an investment for the future. The objective was to ensure that people in Kuhmo could be provided with high-quality potable water under all circumstances. ”During the torrential rain of August 2012, surface water leaked into our main water supply facility, leading to a deterioration in water quality, and we had to take exceptional measures to continue our water supply. Similar and other risks related to water supply are also faced by our two facilities located near the centre.” The new water supply facility is located in an unbuilt and unditched ridge area, where there is no such risk.
It is estimated that the new facility will be able to deliver 500 cubic metres of water per day. This amounts to almost half of the water supply required by central Kuhmo.
”Another important issue is that the new water supply facility provides alkalised water ready for use. The water can be distributed directly.”Safe and quick installation
In Kuhmo, the preferred solution was a Weholite alkalisation plant and a pumping station.
”A concrete tank cast on site would be a more labourintensive and time-consuming option. Due to concrete construction, the excavations would also have remained open for longer. This would have increased the risk posed to groundwater quality during construction on the site. We came close to reaching groundwater level at the construction site.” ”An alkalisation plant of 30 cubic metres and a pumping station of 100 cubic metres were rapidly installed. The tanks were in place within a couple of days.” The citizens of Kuhmo have no previous experience of Weholite tanks, but have closely followed feedback from elsewhere.
”The tanks are already used a great deal. The alkalisation results and user experiences have been good,” Piirainen says. “Water quality is our top priority. We don’t want to take any chances with water quality. That’s something we always take into consideration when selecting partners,” Piirainen emphasises.
Projektinformation
Projektinformation
Liknande projekt
Storsatsning vid Skånes universitetssjukhus i Malmö
Testinstallation av infrakulvert med stor potential
Starkt, säkert och flexibelt
Innovativt - Pålitligt - och installerad på 11 dagar
Uponor markavloppssystem Ultra Rib 2 i Kungälv
Säkert och Hållbart
Infrakulvert Vallastaden
Fokus på framtida hållbarhet
Weholite installerat i Valdemarsvik
Uponor Vault renar dagvatten
ProFuse installerat i Borås Stad
Första installationen av Ultra Rib 2 Blue
Dagvattenmagasin i Järvastaden
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
An easy and reliable storm water solution
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Water treatment plant
Quick installation in the Konotopa channel
Super-sized cooling
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.