A new concept for Uponor’s low thermal loss culvert, embedded in LECA, is being tested here for the first time.

Background

The entire area will be permeated by ecological sustainability and energy-efficient buildings. The neighbourhood will consist of a mix of buildings, including apartment buildings, terraced houses, semi-detached houses and detached houses. All houses will be classified as low-energy houses, i.e. they will be very well insulated, have a high air tightness, efficient ventilation and will recycle heat from the exhaust air in heat exchanger units. The neighbourhood is expected to be ready in 2017.

Solution

“During the first stage 22 terraced houses will be built, and each house will be fed using a new low thermal loss concept for culverts,” says Sami Kallio, product manager for culverts, comfort panels and sprinklers at Uponor. “Lillhamra is unique from Uponor's point of view since it is the first time our culvert will be embedded in LECA. The LECA will be encapsulated with a non-woven fabric and covered with a normal filler. “An independent consulting company has calculated the thermal losses with the Uponor culvert system embedded in LECA, and it demonstrates a very good insulating effect,” says Kallio.

Heating to the area will be distributed by the local energy company Mälarenergi. “This is a solution which means our culvert system meets Mälarenergi’s requirements regarding low thermal losses for an energy-efficient residential area,” says Kallio.

Result

Uponor’s culvert system was installed in this case by Peab Anläggning. “The culvert was convenient to lay, despite some intricacies with the couplings,” says Martin Landås, supervisor at Peab Anläggning. “The LECA worked well too. It was quicker to lay it compared to normal aggregate since it did not need to be processed before the culvert was embedded.”

Ulrika Eriksson, worker at Peab Anläggning, was part of the team who installed the low thermal loss culvert in Lillhamra. “It was the first time we worked with culverts but it worked out fine. We did the culvert training at Uponor Academy just before we started working a Lillhamra, and the training was really useful. The LECA was easy to work with. We tried spraying it in from the truck, but it was easier when it came in cartridges,” says Ulrika Eriksson.

About Uponor culvert systems

• Easy to handle and lay, especially compared to heavy solutions made of steel and copper
• Long life
• Entirely corrosion-free
• Utility pipe made of PEX tolerates heavy flows and does not erode
• The range includes both wells and t-couplings so that an optimal solution can be created for every project
• Plastic and air as insulation provide for flexibility and make it easy to adapt the culvert to the environment
• Insulation properties do not change over time

About Uponor

With solid experience, product know-how and specialist expertise, Uponor sets the standard for private and public projects. We work behind the scenes, but the results of our knowledge and products are encountered on a daily basis. Uponor plumbing offers functional, environmentally friendly solutions for heating, water and cooling that improve people’s quality of life. Following many years in the industry, we know that expertise and commitment are our most important assets when it comes to developing and improving our systems and our clients’ projects. As an Uponor client, you will also have access to skilful technical support, a strong local market organisation and our own centre of expertise, Uponor Academy.

Lower heat losses with pre-insulated pipes laid in LECA at Lillhamra, Sweden

Gösholmen

Информация за проекта

Информация за проекта

Държава
Sweden
Завършване
2010
Тип на проекта
Нова сграда
Тип сграда
Еднофамилно жилище
Продуктови линии
Ecoflex Supra PLUS, Ecoflex Supra, Ecoflex Supra Standard

Партньори

Партньори

Installer
Peab Anläggning AB
Sweden

Подобни проекти

Southwest Homes

Southwest Homes

After Saskatchewan passed the requirement for fire sprinklers in all assisted-living housing, this home needed a solution that would be fast and minimize...
Single-family house's radon renovation

Single-family house's radon renovation

Päijät-Häme is one of the most radon-bearing areas of Finland. Teemu Saarinen from Hollola recognizes the problem. Saarinen measured the radon concentrations in his house and because the values were high he decided to install Uponor radon renovation package.
Getting rid of indoor radon

Getting rid of indoor radon

Uponor's radon system was installed in a detached house in Ilomantsi, completed in 1987. Previously, the radon values in the house were 1,188 becquerels. After installing the system, the radon values dropped to 83.
Luxury family log house

Luxury family log house

Sami Kapanen's dream home was built in 2012 on the shore of Lake Kallavesi near Kuopio. The log house is one of the largest private detached houses in Finland. The house required almost four times as much building services material as a normal detached houses.

The biological treatment plant is worth its price

The Murto family, from Savonlinna, Finland, live in a sturdy log cabin built in 1845. The waste water system of the house had last been overhauled in the 1970s and the old concrete wells and absorption field had reached the end of their lifecycle. The choice was between renovating the old wells and getting an Uponor biological treatment plant, and the decision was not difficult to make.
Renovation of the district heating piping system of six housing companies

Renovation of the district heating piping system of six housing companies

Six housing companies located in the Hurttivuori district in Turku have a joint heating plant – Nokikana Oy. The terraced houses, which were built between 1975 and 1977, contain a total of 104 flats. Heating and water are supplied to all flats by a joint heating plant. Renovating the piping system became a necessity due to leaks. The plant's insulated elements were renovated in such a way that all residents were able to live in their homes for the entire duration of the renovation.
D'or Appartements

D'or Appartements

In one of the most beautiful parts of Budapest, at the bottom of the Sas hill, there is this 88 flat condominium called "D'or Appartements", which consists of 3 blocks. On the 1.23 acre property, there are three 5-story blocks of 32, 31 and 25 flats respectively. The most important aspect in the design of the flats was to create ideal living-space, thus homes between 46 m2 and 105 m2 can be found in the buildings.
Feng Shui home

Feng Shui home

An eco-friendly constructor and a bio-architect teamed up with Uponor Italy to create a balanced combination of new and old, for the perfect indoor climate.
Cottage in Tuscany

Cottage in Tuscany

Near Montevarchi, in the heart of Tuscany, installer Sandro Menga decided to renovate a rural house for his family to live in, using different Uponor solutions.
Wood housing

Wood housing

This "Class A" house is the maximum expression of the words "energy efficiency. This is first "Class A" project outside the Trentino-Alto Adige Region.
Cythia House

Cythia House

Popping up all over the country in the 60s the somewhat practical ‘boxes’ of the social housing market are iconic fixtures on the British landscape.
Elgin Road

Elgin Road

Due to the flexibility of not needing to be regulated; self builders are discovering that it is possible to install underfloor heating system with relative ease.
Momentai House

Momentai House

Momentai House is a magnificent luxury home, 5 bedrooms, 4 bathrooms, office, swimming pool area has MLCP UFH, Plumbing and UP36 Weather Compensation.
West Bay

West Bay

West Bay in Bridport is a primary example of modern living. It utilises the sustainable technology of underfloor heating and flexible installation plastic pipework.
Johnson Residence

Johnson Residence

Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...