Stora Enso Nymölla mill biogas facility, Nymölla, Sweden

Uponor Infra Project Services is back at Stora Enso Nymölla Mill

Uponor Infra Project Services installed and replaced the existing outlet pipe in wood for plastic for Nymölla Mill in 2018 and that work involved partial drawings, stability, corrosion and hydraulic calculations, project management and job descriptions as well as field service including welding of pipes, profile filling, pumping and lowering monitoring. The choice was therefore natural to contact Uponor Infra Project Services again for the work of planning, dimensioning and installing the pipes for the biogas plant and for the replacement and renovation of the infrastructure in the area.
 

Prosjektfakta

Nymölla, Sweden
Industriområde
Kloakk, Kommunal
Ferdigstilt: 2021

Uponor engasjement

5 km Weholite and pressure pipe systems
Fieldservices

A sustainable and reliable solution

- The infrastructure project at Nymölla has been investigated for many years, but installing concrete was never relevant - plastic pipes were already planned. Plastic pipes are durable and have a lifespan of over 100 years, which are important parameters for Nymölla because they do not want to dig up or renovate pipes in the near future. Great focus is also placed on sustainable products or solutions within Stora Enso, where they work a lot with renewable raw materials and recycling, says Henric Höglind, head of Factory Development and project manager for new construction of biogas plant.
 
One of the major challenges for Stora Enso was the ground conditions in the industrial area and what kind of pipes would be found and in what condition they were, when they began to dig up the existing infrastructure in the area. You must also pass with the infrastructure in very narrow passages both above and below ground. Challenges in some passages had to be solved as the ground work started.
- Nymölla Mill is dependent on competent suppliers for these types of work. Uponor Infra Projektservice and PEAB Anläggning are collaborating on this project. We are very pleased that the contractors are collaborating and finding the best solutions and that we can rely on Uponor Infra's extensive experience and expertise of similar projects, which means that we can concentrate on our core business, says Ingemar Persson, project manager for new constructions at Nymölla Mill .
 
Sustainable, safe and flexible piping systems for the fuel supply of the future
In 2008, discussions started about a biogas plant in the Nymölla area. The plan was then that the plant would be operated under the auspices of Nymölla Mill, but they made a "retake" in the discussions and therefore contacted Gasum for production and sale of biogas. Nymölla Bruk's part of the project was to supply the biogas plant with wastewater with the right temperature for the production of biogas and for Gasum to operate and own the plant. Nymölla Mill will make an energy saving because the wastewater is already partially treated in the biogas plant when it reaches the mill's own treatment basins. In this case, it will be a smart and environmentally friendly solution.
- The project also feels right in time, say Ingemar and Henric. The need for imported fossil fuel is reduced. What the biogas plant will produce corresponds to 8.6 million liters of petrol / year, which in turn corresponds to 200 trucks' annual consumption of fuel, say Henric and Ingemar.
 
With sustainable, safe and flexible piping systems, Uponor Infra contributes to the fuel supply of the future. The work with the biogas plant and infrastructure at the mill will be completed in 2021 and Uponor Infra's part of the project consists of deliveries of products, drawings, dimensioning, field service and test printing of 5 km of pipelines.
 
 

Prosjektinformasjon

Prosjektinformasjon

Land
Sweden
Ferdigstilt
2021
Bygningstype
Industriområde
Produktlinje
uponor.productline.title.975a18fc-7af7-4078-8d4f-a6332f61d4d8, Weholite for avløp, uponor.productline.title.e56fcf95-7ab5-4cff-9ca3-ab3f5203da1d

Lignende prosjekt

Fiskeoppdrett med minst mulig avtrykk

Fiskeoppdrett med minst mulig avtrykk

Oppdrettsselskapet Andfjord Salmon AS har ambisjon om å skape en bærekraftig, miljø- og fiskevennlig onshore fasilitet – som etterlater seg et minst mulig avtrykk. Denne patenterte fasiliteten kombinerer det beste fra både tradisjonelle merder til sjøs og landbasert lakseoppdrett. Inn- og utløpslinjene er bygget med robuste Weholite PE-rør og paneler med en forventet levetid på 100 år.
Weholite yields savings and smoother implementation

Weholite yields savings and smoother implementation

New dry land fish farm which will produce 3,200 tonnes of rainbow trout annually is being build in Eckerö in the Åland Islands. Uponor Infra has provided design assistance and delivers the pipes and is responsible for their installation and welding.

Record-breaking intake cooling system in the Philippines

Record-breaking intake cooling system in the Philippines

New challenges are where the Project Services Department at Uponor Infra feels most comfortable and can demonstrate its
continuously developing expertise. The aim on this occasion was to provide a seawater intake cooling system – a pipeline, intake structure and chlorination line – for the 420MW extension of the Pagbilao Coal Fired Power Plant on Luzon Island in the Philippines.
Sustainable  solution for  a pulp & paper mill

Sustainable solution for a pulp & paper mill

Weholite’s ability to withstand external wear, such as friction against the seabed, was an important criterion when the outfall pipe of Stora Enso’s pulp and paper mill in Nymölla, southern Sweden, had to be replaced.

 

 

A raw water system for the new power unit

A raw water system for the new power unit

To ensure failure-free operation of a raw water system, a polyethylene-made pipeline (PEHD) with a length of approximately 9 km was installed (in mining damage conditions), of which 3 km uses the trenchless technique – relining.
Record-breaking pipes in Keljonlahti

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.
Extension of the district cooling station seawater intake in Helsingborg, Sweden

Extension of the district cooling station seawater intake in Helsingborg, Sweden

 The district cooling system in Helsingborg involves the streamlining of current production. By means of seawater and using heat from the district heating network to power an absorption cooling unit, district cooling provides much better environmental values than electric cooling units. The district cooling station is an efficient source of cooling for buildings, industrial facilities and shopping centres.