PE pressure sewer system from Harjavalta to the city of Pori
PE pressure sewer system pipe line is almost reach at its final destination. The length in total is almost 30 kilometers and the pipe diameter grows from 400 to 710 mm.
PE pressure sewer system pipe line is almost reach at its final destination. The length in total is almost 30 kilometers and the pipe diameter grows from 400 to 710 mm.
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.
The wastewater from the new biopower plant will be collected in a Weholite tank designed by Uponor for the site.
The Launonen day-care centre has environmental friendly heating and storm water handling system which ensure the better environment for the children.
Roihu 2016 – the 7th International Finnjamboree organised by Suomen Partiolaiset - Finlands Scouter ry, was held at the Evo campsite in Hämeenlinna on 20–28 July 2016. A camp for 17,100 people was built in a forest area owned by Metsähallitus. Some 3,000 participants arrived from abroad – from about 40 different countries. Uponor delivered 7,600 metres of pipes to the area. The pipes were used to supply clean water and to lead grey water away from the area in a controlled manner.
the topping out for the largest investment of the Finnish forest industry, the new bioproduct plant under construction in Äänekoski in Central Finland, took place on the construction site mid-May 2016. Hectic installation work on the site will continue before the plant’s test runs begin next spring. Uponor Infra delivers municipal engineering to the site, such as water, sewer and stormwater pipes, and a massive Weholite cooling water discharge pipe that is over one kilometre in length.