Clean drinking water for 17,000 scouts
Roihu 2016 – the 7th International Finnjamboree organised by Suomen Partiolaiset - Finlands Scouter ry, was held at the Evo campsite in Hämeenlinna on 20–28 July 2016. A camp for 17,100 people was built in a forest area owned by Metsähallitus. Some 3,000 participants arrived from abroad – from about 40 different countries. Uponor delivered 7,600 metres of pipes to the area. The pipes were used to supply clean water and to lead grey water away from the area in a controlled manner.
A project of large numbers
the topping out for the largest investment of the Finnish forest industry, the new bioproduct plant under construction in Äänekoski in Central Finland, took place on the construction site mid-May 2016. Hectic installation work on the site will continue before the plant’s test runs begin next spring. Uponor Infra delivers municipal engineering to the site, such as water, sewer and stormwater pipes, and a massive Weholite cooling water discharge pipe that is over one kilometre in length.
A new generation biotechnology factory
The object for the largest investment in the Finnish forest industry has been completed. Metsägroup's pulp mill in Äänekoski started operations in August 2017. Uponor Infra was involved in building a new generation bio mill.
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
In December 2011 Central Finland´s ELY –centre (The Centre for Economic Development, Transport and the Environment) started significant road constructing project in Jyväskylä. The aim is to create a new route between highways 18, 9 and 4, which helps reduce traffic jams and smoothes commutation. Uponor was chosen to be one of the suppliers due to our delivery capacity and overall cost efficiency.
TV-Tower, Estonia
The tallest building in Estonia and the major cultural attraction, the Tallinn TV-Tower, is equipped with Uponor underground ventilation technology.
Tailor-made pipes ensure a better water supply
Uponor Infra has designed a complete pipe solution for a new water tank. 400 m DN 800 pipes and 300 m DN 630 pipes now ensure Søborg citizens better water supply.
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
Uponor delivers tanks for a ground-breaking development project at Vestforbrænding
Uponor delivers tanks for a ground-breaking development project at Vestforbrænding
Waste water treatment development in Ishøj industrial area
The project involves a great deal of sewerage work, as the former farmland is now being prepared for industrial purposes.
Drinking water passing through contaminated area in Thisted
Citizens’ safety comes first when water utility sought to protect the municipality's drinking water from toxic chemicals.
IQ tanks takes the pressure of public stormwater network
IQ tanks for a stormwater solution in Aarhus