The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.

Fakty o projekcie:

Lahti, Finland
Infrastruktura transportowa
System ogrzewania/chłodzenia płaszczyznowego Uponor
Realizacja: 2016

Zaangażowanie Uponor

850 m2
In this project, the construction company is Sito and the main contractor is Työyhteenliittymä Aleksanteri, whose shareholder companies are EKT infra Oy and Läänin Kuljetus Oy. The project extends over an area of 12,000 square metres.

 

Planning and installation service

For Uponor, the project began in July 2016. Uponor and its partners were responsible for installing frame pipes as well as for planning the snow melting system. A total of 330 metres of Ecoflex Thermo Single 125/250 pipes, which are intended for large power transfers, were delivered to the site. In the snow melting system, heat is supplied to the pipes from a house by the street and is then distributed to five wells through the Thermo Single pipes. Hot water leaves the wells from the Uponor Magna manifolds and then flows evenly through the pipes to pavements and zebra crossings. The pipes of the snow melting system are made from PEX material, which prevents oxygen diffusion. The rain and temperature sensors installed on the road surface are used to make sure that the snow melting system functions as planned.

 

Minimal disruption to traffic

Aleksanterinkatu is the most lively pedestrian area in Lahti, with local buses running up and down all the time. A special requirement was that construction in the area had to be carried out in stages to prevent excessive disruption to road and pedestrian traffic. Site Manager Santtu Vesterinen from EKT Infra Oy thanks everyone for the cooperation.

- Several parties are involved in the project, and everybody's interests must be taken into account. For example, efforts have been made to find functional solutions together with property owners and tenants in order to prevent excessive disruption to local business. Cooperation has worked well.

- Installations are mainly carried out in the evening to minimise disruption to traffic. Furthermore, the lanes for motor traffic are moved as the work progresses, says Ari Sahanen from Uponor.

A lot of planning had to be done during work.
- Issues have arisen that have caught us by surprise, but we have always been able to find a solution together. We are within schedule, and the project in the centre of Lahti will be completed in November as planned, emphasises Jani Lepistö from Sito Lahti.

Ice-free pavement throughout the year in Lahti

aleksin sulatus_1_700x450

Informacje o projekcie

Informacje o projekcie

Kraj
Finland
Realizacja
2016
Rodzaj projektu
Renowacje
Rodzaj budynku
Infrastruktura transportowa
Linia produktu
Meltaway

Partnerzy

Partnerzy
Project owner: City of Lahti
Planners: Sweco - Vilma Heljo
Contractors: Sepon Putkityö and Lahden Lämpötekniikka
Public works contractor: EKT Infra Oy - Santtu Vesterinen

Podobne projekty

Kanalizacja deszczowa dworca kolejowego

Kanalizacja deszczowa dworca kolejowego

Specyfika budowy kanalizacji deszczowej w ramach inwestycji kolejowych polega na tym, że musi być ona odporna m.in. na dynamiczne obciążenia pochodzące od przejeżdżających pociągów. W przypadku stacji w Koninie ważnym elementem układu kanalizacji deszczowej są zbiorniki retencyjne.
Zbiorniki retencyjne w terenach górskich

Zbiorniki retencyjne w terenach górskich

Budowa drogi ekspresowej S1 na odcinku Przybędza-Milówka, nazywanym obejściem Węgierskiej Górki. Do odwodnienia układu drogowego wybrano charakteryzujące się doskonałymi właściwościami zbiorniki polietylenowe Uponor Infra.
Zbiorniki retencyjne dla terminala multimodalnego

Zbiorniki retencyjne dla terminala multimodalnego

W Zduńskiej Woli - Karsznicach powstaje właśnie jeden z największych w Polsce terminali multimodalnych.  Najważniejszymi elementami układu zagospodarowującego wody deszczowe tego terminala będzie bateria dwóch zbiorników retencyjnych Uponor Infra.
Modernizacja śluzy na stopniu wodnym

Modernizacja śluzy na stopniu wodnym

Na stopniu wodnym Krapkowice trwa modernizacja śluzy i sterowni oraz przebudowa awanportów. Uponor Infra dostarczyła na tą budowę rury polietylenowe Weholite DN2000 SN8 a także studzienki, łuki segmentowe i kształtki specjalne.
 
Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.