Referanser
Sustainable solution for Denmark’s largest infrastructure project
Pump structure secures stormwater system’s long life
Pump structure secures stormwater system's long life in Jyllinge Nordmark
Faroe Island tunnel with Uponor pipe system
In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Retention tanks in the Neptun Park housing estate
Uponor Infra has delivered PE SN8 DN2400 retention tanks with a total capacity of V = 510m3 to the Neptun Park estate, which will collect stormwater from the estate area.
Barrier PLUS sikrer Thisteds borgere rent drikkevann
Borgernes sikkerhet ble prioritert da Thisted Vand ønsket å beskytte kommunens drikkevann mot giftige kjemikalier.
Relining to the rescue in Kajaani
In Kajaani, a pressurised sewer that has broken down due to faulty installation will be renewed by relining. This reliable and fast method will also be cheaper than excavating for the site.
Infra Utility Tunnel installation
Akademiska Hus is together with the campus facility Cassiopeia plans to build about 300 apartments in Lund
Fordrøyningsmagasin på 20 meter – uten skjøter
Vi leverte fordrøyningsmagasin med innebygget sandfang og virvelkammer til et boligprosjekt på Storo i Oslo. Én enkelt leveranse uten behov for mobilkran eller trafikkdirigering gjorde dette til en effektiv prosess.
Fordrøyning med sandfang hos Protonsenteret
Uponor Infra leverte Weholite fordrøyningsmagasin med en innvendig diameter på 2 meter til Protonsenteret. Magasinet har integrert sandfang.
Fordrøyningsmagasin i parkeringsområde hos Coop
Uponor Infra leverte et Weholite-magasin til fordrøyning av overvann på parkeringsområdet hos Coop Obs Rudshøgda i Ringsaker kommune. Fordrøyningsmagasinet ble produsert i 2000 mm SN4 Weholite.