Referanser

157 Resultater funnet
Vei og Jernbane

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.

Boligområde

1000 mm IQ fordrøyningsmagasin

Vi har levert et 1000 mm IQ fordrøyningsmagasin med en lengde på 24 meter til prosjektet GMB Student på Fjøsanger i Bergen. Løsningen skal bidra til lokal overvannshåndtering ved å forsinke avrenningen og redusere risikoen for oversvømmelser i området.

Kommunalt område

PE-tanker reduserer CO2-avtrykket på nytt vannverk

Uponor PE-tanker ble valgt til Novafos’ nye vannverk i Ballerup, Lautrupvang Vandværk. Tankene løser økonomiske og estetiske utfordringer, reduserer CO2-utslipp med opptil 50 prosent sammenlignet med tradisjonelle tankløsninger og øker forsyningssikkerheten.

Vei og Jernbane

Retention tanks for a bus depot

One of the most modern bus depots in the region is currently being built in Wałbrzych. A key component of the stormwater management system will be a battery of four retention tanks supplied by Uponor Infra.

Kommunalt område

Filtertanker til Åsland snødeponi

Vi leverte tre filtertanker til Åsland snødeponi, på oppdrag fra Oslo kommune Bymiljøetaten. Tankene ble produsert i 2400 mm Weholite og har en lengde på 10,5 meter hver. Med denne løsningen renses smeltevannet fra blant annet sink, bly og kobber.

Kommunalt område

Uponor filter chamber part of the stormwater study

In recent years, stormwater quality management has become an increasingly important part of urban stormwater strategies. A pilot project was launched in Heinola to clean stormwater with innovative filter chambers developed by Uponor. At the same time, valuable research data will be collected on stormwater quality from two different types of areas and on the treatment results achieved with filter chambers.

Kommunalt område

AquaDjurs takes the next step in efficient stormwater management

The water and wastewater utility AquaDjurs is introducing a new solution to ensure effective treatment of stormwater. The solution is expected to significantly reduce installation and operational costs while improving the treatment performance of runoff.
 
 
Kommersielt område

Brannvannstanker på 108 m³ til Kragerø Resort

Vi har levert to stk. 13,5 m lange brannvannstanker på 108 m³ med en innvendig diameter på 2400 mm til Kragerø Resort. En av tankene har et teknisk rom der det er to stk. trykkøkningspumper fra KSB. Tankene er produsert i Weholite (dobbeltvegget PE) og er kjøresterke. Det skal etableres oppstillingsplass for utrykningskjøretøy over dem.

Rekreasjonsområder

Fordrøyningsanlegg til hyttefelt

Vi leverte et fordrøyningsanlegg for overvannshåndtering ved et hyttefelt i Øyer kommune. Entreprenør på prosjektet var Nermo Maskin AS.