Background
With the start at beginning of October 2009 a graduation of water pipes is going on Skogsrydsvägen in Frufällan outside Borås. A popular area which needs to be prepared for new houses and increased moving in with higher capacity for the water handling! The road is approx. two km and the work is calculated to be ready in February 2010. The work is ordered by Borås town and it is the Service office which carries out the job. The new pipes come mainly from Uponor.
Solution
The capacity increase is facilitated by the change from the old 150 mm pipes to Uponor’s pressure pipe system Profuse with the diameter 250 mm. Besides a distance of about 500 m where excavating was needed, the new pipes are drawn by pipe cracking. One takes stage by stage, transports poles through the old pipes and fixes the new pipe in the other end. Then the new pipes are pulled back and land right without devastating digging is needed. Pipe cracking is used on the remaining distance for 1,8 km.
“So besides the capacity increase with an increased diameter, you will now have a more hygienic pipe.”
Pipe cracking is a flexible method when new pipes will replace old ones. There will be less disturbances and ground damages. The risks are in crossing pipes and if the pipe should not go deep enough. Then cracks or damages can arise. To minimize the risks the constructors have a good check on all available pipes and they film both before and after the job.
Result
The pressure pipes Profuse replace the old cast iron pipes. So besides the capacity raising with an increased diameter, you will furthermore get a more hygienic pipe. Cast iron has an inclination to put on many coats which risk stopping the flow completely. Such coats cannot come up in a plastic pipe. The new pipes on Skogsrydsvägen can be seen as a first step. “Quite certain more lengths will have new pipes with higher capacity onwards”, Magnus Eriksson, foreman on the Service office Borås town, says.
Projektin tiedot
Projektin tiedot
Yhteistyössä mukana
End user
Borås Stad
Samankaltaisia projekteja
Massiivinen jätevesiviemäri Harjavallasta Poriin
Porin ja Harjavallan välille valmistui massiivinen jätevesien siirtoviemäri.
Kestävyyttä ja laatua tieinfraan Uponor IQ-hulevesijärjestelmällä
Kuokkalaan avattiin marraskuussa 2013 kehäväylä. Väylälle asennettiin 2 kilometriä Uponorin IQ-hulevesiputkea, 250 kaivoa ja 5 kilometriä salaojaputkea.
Vesijohto mökkiläisille vesiosuukunnan turvin
Turvallista, nopeaa ja helppoa
Nyt on NOPEAA
Palojätevedet turvallisesti talteen
Saneeraukset sujumaan
Hyvä on harjuksen hyppiä puhtaassa Ounasjoessa
Parempaa pohjavettä
Lämmitettävät putket takaavat sammutusveden
Euroopan suurin muovinen tierumpu Norjaan
Hulevedet talteen
Weholitesta ilmastussäiliö Iisalmeen
Kurikka sujuttaa vanhat viemärilinjat
Antaa sataa vaan
Puhdasta juomavettä 17 000 partiolaiselle
Uponorin uusin järjestelmä, Ultra Double, korvasi Raahen vanhan betoniputken
Ympäristöystävällistä lämmitystä ja vedenkäsittelyä Launosten päiväkodissa
Hybridiratkaisuja hulevesien hallintaan
Helppo ja luotettava hulevesiratkaisu
Hulevedet ja epäpuhtaudet fiksusti haltuun
Varmuutta tunneleiden runkolinjoihin
Suoraa hyötyä kaarista
Lahti Energia käyttää työmaillaan ensimmäisenä Suomessa kaariputkia. Kokemukset ovat olleet erittäin hyviä.
Lahden Vipusenkadulla uusittiin kaukolämpöverkkoa. Kaivantoon on laskettu isoja kahdentoista ja kuudentoista metrin DN 300 -putkia. Hitsaajat ovat ryhtymässä töihin. Jokin jää kuitenkin askarruttamaan ohikulkijan mieltä.
Samaan aikaan toisaalla, keskustasta Launeelle johtavalla kaukolämpölinjalla operoidaan hieman tuhdimpien DN 400 -putkien kanssa. Täälläkin sama juttu. Aivan kuin kaikki putket eivät olisi ihan suoria?
Hulevedet haltuun helposti ja nopeasti
Kajaanissa sujuu, kun sujutetaan
Iisalmen Vesi saneerasi runkolinjan sujuttamalla
Tuplasti varmuutta Pohjavesialueelle
Virtausmittaus paljastaa vesijohtoverkoston vuodot
Turvallinen juomavesiverkko entiselle teollisuusalueelle
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
Weholite limits overflows and pollution in London
Weholite installed in Valdemarsvik Sweden
Uponor Vault cleans the storm water
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Uponor Infra culverts in major investment at Skåne University Hospital in Malmö
A test installation of an infra culvert with great potential
Strong, Safe and Flexible
Innovative, reliable - and installed in 11 days
Uponor soil drainage system Ultra Rib 2 in Kungälv
Infratunnel protects pipes and cables in new residential area
Focus on sustainability
Flow measurement reveals leaks in the water supply network
Quick installation in the Konotopa channel
Super-sized cooling
Weholite tanks have multiple uses
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.