Safe water supply for an old shipyard and sawmill area, Oulu, Finland
Safe potable water for an old shipyard and sawmill area
The waterfront area was in industrial use for over 100 years. Shipbuilding began in Pateniemi in 1856, when businessmen in Oulu set up a shipyard – over the years, it became one of the largest Finnish shipyards of its time. It was a major employer in the city, with more than 400 people working there at its peak. It built ships such as barques and frigates that mainly brought grain to Europe from the United States, India and Australia.
When shipbuilding waned in the 1870s, a steam-powered sawmill was established in Pateniemi. Sawmill operations continued there for over 100 years until 1990.
The area is now owned by Aalto Construction Oy, with which the City of Oulu has made an agreement on cooperation and zoning.
Brisk construction in the area
Veneenveistäjänranta is now being built up at a rapid pace. Many construction companies are hard at work in the area. The new residential area is scheduled to be fully completed by 2030. One of the developers is the Oulu-based company Rakennus- Hanka Oy, whose houses are being built in three phases. Located a stone’s throw away from the seashore, the first homes were completed in autumn 2021.“We have two plots in this area – we’ll build a total of 75 semidetached and terraced houses on them. This autumn, we’ll complete 18 residential units. The last of the houses will be finished by 2025,” says Ilpo Vakkuri, CEO of Rakennus-Hanka.
Diffusion-protected pipes are a requirement
After the closure of the sawmill, the soil in this area was studied and remediated thoroughly over a period of many years. Some of the soil had been contaminated by impregnating agents used at the sawmill. For example, the sawmill used chlorophenol- based KY-5 to protect sawn timber against blue stain fungi – the use of KY-5 was prohibited in the late 1980s.After soil remediation, there were no longer any restrictions on the use of this area. However, the City of Oulu has wanted to ensure safe water supply – and has required the use of diffusionprotected pipes in the water supply network.
“Uponor is a familiar partner to us – we’ve been working together for over 20 years. When Uponor told us about the Barrier PLUS pipes, we decided to use them in this contract. We had no previous experience of these pipes,” says Ilpo Vakkuri.
The Uponor Barrier PLUS pressure pipe system was launched three years ago. It is the first 100% plastic pressure pipe system that makes it possible to safely build potable water lines in highrisk areas and contaminated soil. The durable Barrier PLUS pipes feature a seamless and non-permeable polymer layer structure that protects potable water against hazardous substances and both taste and smell problems.
These flexible pipes are fast to install. They are suitable for both new construction and renovation, and are fully compatible with standard PE potable water pipes.
Smoothly and on schedule
Vakkuri says that the installation of Barrier PLUS pipes for the houses that are currently under construction has been almost completed. All in all, about one kilometre of pipes will be installed on Rakennus-Hanka’s plots. The project uses pipes with diameters of 40–63mm.The installation of the pipes has proven to be easy and smooth. “We’ve borrowed electrical welding equipment from Uponor for installing extensions and T-branches. Uponor also provided us with guidance on pipe wrap installation and good clear instructions that made our work easy.”
Barrier PLUS wraps ensure perfectly tight and secure seams. The installation of one wrap takes 10–15 minutes. Once the plastic wrap has been wound around the protective jacket of the pipe, a shrink sleeve is heated over it to seal it tight. The wraps and shrink sleeves have been pre-dimensioned for the pipes, so there is no need to measure and cut them to size at the site.
In addition to Barrier PLUS pipes, Uponor has delivered sewer pipes and wells for the yard areas as well as water and sewer pipes for the residential units. “The installation work has gone well and on schedule. We’ll continue with the installation of Barrier PLUS pipes in the autumn,” says Vakkuri.
Fakty o projekcie:
Zaangażowanie Uponor
Uponor Barrier PLUS wraps
Safe water supply for an old shipyard and sawmill area
An old shipyard and sawmill area in Oulu, Finland, is entering new era of a residential area for 2500 inhabitants. Due to history of the area, the cotractor wanted to ensure a safe supply of drinking water in the area.
Uponor is a familiar partner to us - we've been working together for over 20 years. When Uponor told us about the Barrier PLUS pipes, we decided to use them in this contract.
Informacje o projekcie
Informacje o projekcie
Partnerzy
Rakennus-Hanka Oy
Podobne projekty
Rurociąg tymczasowy dla oczyszczalni Czajka
Szybka akcja była bardzo ważna, gdy poważnemu uszkodzeniu uległ kolektor ściekowy w Warszawie, powodując masowy wyciek nieczystości do Wisły. Załoga Uponor Infra pracowała 24 godziny na dobę, aby powstrzymać zanieczyszczenie rzeki. Tymczasowy rurociąg został wyprodukowany, dostarczony i połączony w ciągu zaledwie ośmiu dni.
Inteligentny system retencyjny
Budowa rurociągów tłocznych do oczyszczalni ścieków
Budowa kolektorów dla oczyszczalni ścieków
Renowacja żelbetowego kolektora ściekowego
Retencyjny kanał ściekowy
Renowacja żeliwnego wodociągu
Dzięki metodzie ciasnopasowanej możliwa była modernizacja magistrali wodociągowej w centrum Łodzi, na terenie silnie zurbanizowanym w pasach drogowych o dużym natężeniu ruchu pojazdów kołowych i szynowych.
Wylot morski
Wylot morski - wyprowadzenie wód potoków
Renowacja zniszczonego kanału kamionkowego
Układ separacji ścieków
Budowa kolektorów deszczowych w Nowych Polkowicach to jeden z etapów dużej inwestycji polegającej na odwodnieniu dzielnicy.
Wylot morski oczyszczonych ścieków
Wylot morski oczyszczonych ścieków do morza w Swarzewie to kolejna proekologiczna inwestycja, w której wykorzystano rury polietylenowe produkcji Uponor Infra.
Rurociąg awaryjny na moście pontonowym
Bateria zbiorników retencyjnych
Renowacja wodociągu na terenie szkód górniczych
Renowacja kolektora ściekowego
Budowa alternatywnego układu przesyłowego ścieków
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Weholite installed in Valdemarsvik Sweden
Uponor Vault cleans the storm water
Uponor pressure pipe system Profuse in Borås town
Uponor Infra culverts in major investment at Skåne University Hospital in Malmö
A test installation of an infra culvert with great potential
Strong, Safe and Flexible
Innovative, reliable - and installed in 11 days
Uponor soil drainage system Ultra Rib 2 in Kungälv
Infratunnel protects pipes and cables in new residential area
Focus on sustainability
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.