ProFuse installed in Borås Stad, Frufällan, Sweden
Better water flow in Frufällan
The increase in capacity is made possible by the change from the old 150 millimeter pipes to Uponor's ProFuse pressure pipe system with a diameter of 250 millimeters. In addition to about 500 meters where excavation is required, the new pipes are laid with pipe bursting. You take step by step, pass through threaded rods through the old pipes and attach the new pipe to the other end. Then the new pipe is pulled back and ends up right away without the need for devastating excavation. Pipe bursting is used on the remaining 1.8 kilometers.
"So in addition to the capacity increase with an increased diameter, you now also get a more hygienic pipe."
Pipe bursting is a flexible method when new pipes are to replace existing ones. There will be minor disturbances and ground damage. The risks lie in any intersecting lines and if the pipe does not go deep enough. Cracks or damage can then occur. To minimize the risks, the contractors have good control of all existing pipelines and film both before and after the work.
ProFuse replaces old-fashioned cast iron pipes
Pressure pipes ProFuse replaces old-fashioned cast iron pipes. So, in addition to the capacity increase with an increased diameter, you now also get a more hygienic pipe. Cast iron pipes tend to attract a lot of coatings that risk stopping the flow completely. Such coatings do not occur in a plastic pipe. The new pipes on Skogsrydsvägen can be seen as a first stage.
Projektin tiedot
Uponorin osallistuminen
Dimension: 250 mm
Length: 2232 m
Certainly, more routes will have new pipes with higher capacity in the future," says Magnus Eriksson, foreman at the Service Office, City of Borås.
Projektin tiedot
Projektin tiedot
Samankaltaisia projekteja
Massiivinen jätevesiviemäri Harjavallasta Poriin
Porin ja Harjavallan välille valmistui massiivinen jätevesien siirtoviemäri.
Kestävyyttä ja laatua tieinfraan Uponor IQ-hulevesijärjestelmällä
Kuokkalaan avattiin marraskuussa 2013 kehäväylä. Väylälle asennettiin 2 kilometriä Uponorin IQ-hulevesiputkea, 250 kaivoa ja 5 kilometriä salaojaputkea.
Vesijohto mökkiläisille vesiosuukunnan turvin
Turvallista, nopeaa ja helppoa
Nyt on NOPEAA
Palojätevedet turvallisesti talteen
Saneeraukset sujumaan
Hyvä on harjuksen hyppiä puhtaassa Ounasjoessa
Parempaa pohjavettä
Lämmitettävät putket takaavat sammutusveden
Euroopan suurin muovinen tierumpu Norjaan
Hulevedet talteen
Weholitesta ilmastussäiliö Iisalmeen
Kurikka sujuttaa vanhat viemärilinjat
Antaa sataa vaan
Puhdasta juomavettä 17 000 partiolaiselle
Uponorin uusin järjestelmä, Ultra Double, korvasi Raahen vanhan betoniputken
Ympäristöystävällistä lämmitystä ja vedenkäsittelyä Launosten päiväkodissa
Hybridiratkaisuja hulevesien hallintaan
Helppo ja luotettava hulevesiratkaisu
Hulevedet ja epäpuhtaudet fiksusti haltuun
Varmuutta tunneleiden runkolinjoihin
Suoraa hyötyä kaarista
Lahti Energia käyttää työmaillaan ensimmäisenä Suomessa kaariputkia. Kokemukset ovat olleet erittäin hyviä.
Lahden Vipusenkadulla uusittiin kaukolämpöverkkoa. Kaivantoon on laskettu isoja kahdentoista ja kuudentoista metrin DN 300 -putkia. Hitsaajat ovat ryhtymässä töihin. Jokin jää kuitenkin askarruttamaan ohikulkijan mieltä.
Samaan aikaan toisaalla, keskustasta Launeelle johtavalla kaukolämpölinjalla operoidaan hieman tuhdimpien DN 400 -putkien kanssa. Täälläkin sama juttu. Aivan kuin kaikki putket eivät olisi ihan suoria?
Hulevedet haltuun helposti ja nopeasti
Kajaanissa sujuu, kun sujutetaan
Iisalmen Vesi saneerasi runkolinjan sujuttamalla
Tuplasti varmuutta Pohjavesialueelle
Virtausmittaus paljastaa vesijohtoverkoston vuodot
Turvallinen juomavesiverkko entiselle teollisuusalueelle
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
Weholite limits overflows and pollution in London
Weholite installed in Valdemarsvik Sweden
Uponor Vault cleans the storm water
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Uponor pressure pipe system Profuse in Borås town
Uponor Infra culverts in major investment at Skåne University Hospital in Malmö
A test installation of an infra culvert with great potential
Strong, Safe and Flexible
Innovative, reliable - and installed in 11 days
Uponor soil drainage system Ultra Rib 2 in Kungälv
Infratunnel protects pipes and cables in new residential area
Focus on sustainability
Flow measurement reveals leaks in the water supply network
Quick installation in the Konotopa channel
Super-sized cooling
Weholite tanks have multiple uses
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.