Super-sized cooling, Manila, Philippines
Super-sized cooling
The Petron Bataan Refinery (PBR), based in the Philippines, chose Weholite, a high density polyethylene (PE-HD) pipe, for the completion of its cooling water intake and outfall pipelines. As part of the redevelopment, Uponor Infra supplied the world’s first plastic super-size intake structure, made from its new Weholite profile panels, which are lighter, faster to install, and therefore much better value than traditional solutions.
Fakty o projekcie:
Zaangażowanie Uponor
The Petron Bataan Refinery (PBR) is the Philippines’ largest integrated crude oil refinery and petrochemicals complex. Inaugurated in 1961, with a capacity of 25,000 barrels per day, it has steadily grown to its currently rated capacity of 180,000 barrels-per-day.
In 2011, Petron decided to develop the Refinery Expansion Project (RMP-2), in order to make the refinery more competitive in the Asia-Pacific region, by significantly increasing its production rate (by up to 200% for some products).
The Project Services team at Uponor Infra, composed of international experts in providing turnkey solutions for the marine environment, designed, installed and supervised the installation of a cooling water intake pipeline and discharge outfall, and all of the intake offshore structures for the project.
Easily welded, no corrosion
The Korean company, Daelim, was the EPC contractor, while CCT-Toyo was the consortium that carried out all of the required tasks for the civil and marine works involved in the cooling system.
It did not take long for the CCT-Toyo Consortium to understand all of the advantages that Weholite would provide for their PBR cooling system.
Weholite, the global leading brand in large-diameter pipe technology, is one of the few solutions on the market that can be produced with internal diameters of up to 3.5 metres. The PE-HD pipe can easily be welded together on site and does not corrode, which is a crucial factor when pipes are installed in salt water and marine applications. As part of the redevelopment, Uponor Infra supplied the world’s first plastic super-size intake structure – made from its new Weholite profile panels – which are lighter, faster to install and therefore much better value than traditional solutions.
Less than one month after its first visit to the Philippines in August 2012, the consortium gave the final yes to having a cooling system made of Weholite.
Teamwork in three countries
Uponor Infra Project Services’ wealth of experience in these types of projects and installations is the ideal complement for Weholite, particularly when working on a project on the other side of the globe.
610 metres of Weholite SN4 ID 2,400mm for the intake and 450 metres of SN4 ID 2,200mm for the outfall were produced in the Uponor Infra factory in Thailand, under the supervision of Project Services in Vaasa, Finland. The connection flanges and fittings also came from Thailand. Uponor Infra provided all of the hydraulic and mechanical calculations for the intake and outfall, and handled the supervision of the installation process.
In May 2013, Project Services mobilised a crew of welders from Vaasa to the Philippines to start work at the Orion Port in Manila Bay, the site provided by CCT-Toyo for the welding activities and the launch of the Weholite strings. Meanwhile, the Project Services office in Vaasa was working on the design and calculations for the manufacture and installation of the two pipelines. The team was completed by the addition of two welders from the Uponor Infra subsidiary in Thailand.
Weholite means major cost savings
Weholite was chosen for its design lifetime guarantee and non-corrosive material, all of which enable Petron to avoid costly maintenance.
Pablo Ramón, the project services site manager at Uponor Infra, commented as follows:
“Weholite was ideal for this complex marine project for a number of reasons, as it eliminated the need for heavy concrete collars to ballast the strings, which can often be extremely risky during submersion. Filling its hollow profile with an inexpensive and pumpable material, such as limestone, was much faster and easier.”
“The submarine installation of Weholite is faster than that of steel pipes, allowing the installation of up to 200 linear metres in just one day. Since Weholite doesn’t require concrete collars, the contractors were able to use a smaller trench, which minimised the dredging operation. The reduced volume of excavations meant lots of savings, since work done under water costs much more than work done on dry land,” he added.
Although this was not Uponor Infra’s first marine project in Asia, it was a milestone in the Philippines. It was also a major success, being the first time that plastic had been used as the lead material for an application of this kind in the Philippines. Weholite now has plenty of admirers in this part of Asia.Informacje o projekcie
Informacje o projekcie
Podobne projekty
Rurociąg tymczasowy dla oczyszczalni Czajka
Szybka akcja była bardzo ważna, gdy poważnemu uszkodzeniu uległ kolektor ściekowy w Warszawie, powodując masowy wyciek nieczystości do Wisły. Załoga Uponor Infra pracowała 24 godziny na dobę, aby powstrzymać zanieczyszczenie rzeki. Tymczasowy rurociąg został wyprodukowany, dostarczony i połączony w ciągu zaledwie ośmiu dni.
Inteligentny system retencyjny
Budowa rurociągów tłocznych do oczyszczalni ścieków
Budowa kolektorów dla oczyszczalni ścieków
Renowacja żelbetowego kolektora ściekowego
Retencyjny kanał ściekowy
Renowacja żeliwnego wodociągu
Dzięki metodzie ciasnopasowanej możliwa była modernizacja magistrali wodociągowej w centrum Łodzi, na terenie silnie zurbanizowanym w pasach drogowych o dużym natężeniu ruchu pojazdów kołowych i szynowych.
Wylot morski
Wylot morski - wyprowadzenie wód potoków
Renowacja zniszczonego kanału kamionkowego
Układ separacji ścieków
Budowa kolektorów deszczowych w Nowych Polkowicach to jeden z etapów dużej inwestycji polegającej na odwodnieniu dzielnicy.
Wylot morski oczyszczonych ścieków
Wylot morski oczyszczonych ścieków do morza w Swarzewie to kolejna proekologiczna inwestycja, w której wykorzystano rury polietylenowe produkcji Uponor Infra.
Rurociąg awaryjny na moście pontonowym
Bateria zbiorników retencyjnych
Renowacja wodociągu na terenie szkód górniczych
Renowacja kolektora ściekowego
Budowa alternatywnego układu przesyłowego ścieków
Plastic ensures condensation-free ventilation at new hospital and research facility
Pump structure secures stormwater system’s long life
Drinking water passing through contaminated area in Thisted
Intake pipeline for seawater in Copenhagen Harbour
Butt welding by night of 900 mm pipes ensures stable operation of a district cooling solution in Copenhagen Harbour.
TV-Tower, Estonia
Heavy-duty pipe for Tallinn’s district heating network
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
New water pipeline
Now that’s truly FAST
Handling storm water in a smart way
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Urban runoff under control – quickly and easily
Relining to the rescue in Kajaani
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Weholite limits overflows and pollution in London
Weholite installed in Valdemarsvik Sweden
Uponor Vault cleans the storm water
Uponor pressure pipe system Profuse in Borås town
Uponor Infra culverts in major investment at Skåne University Hospital in Malmö
A test installation of an infra culvert with great potential
Strong, Safe and Flexible
Innovative, reliable - and installed in 11 days
Uponor soil drainage system Ultra Rib 2 in Kungälv
Infratunnel protects pipes and cables in new residential area
Focus on sustainability
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.