Focus on sustainability, Borås, Sweden
Focus on sustainability
The town of Borås in Sweden is striving to become independent of fossil fuel. The Sobacken Project, involving a combined heat and power plant, sewage treatment plant and a production Plant for biogas, is an important part of the town’s commitment to this goal. The aim is to secure the town’s infrastructure and energy system for the future. The building of Sobacken, with its new combined heat and power plant, sewage treatment plant and additional facility for biogas production, began in the spring of 2015 and is due for completion in 2018. The project’s budget is SEK 3.4 billion and it has attracted both national and international attention due to its focus on future sustainability. For example, Sobacken will guarantee the supply of district heating to the people of Boras, will have the capacity to achieve statutory environmental limits for wastewater, handle all household sewage, and fulfil the town of Boras’ ambitious environmental goals related to renewable electricity.
Projektfakta
Uponors rolle
Responsibility from drawing to installation
Because the sewage treatment plant needs safe and reliable pipes and couplings between its wastewater treatment basins, the contractor chose Weholite as its system solution. However, Uponor’s contribution to this complex and prestigious project is not just about supplying Weholite. It also includes project management and technical support such as design and calculations, customized products and field service with onsite installation – all coherently coordinated by Uponor Infra Project Services.
Prefabrication and customization
The primary reason for preferring Weholite to traditional solutions using stainless steel or concrete pipes was the fact that Weholite is extremely flexible and easy to work with. For example, most components can be prefabricated and customized at Uponor Infra. This implies the minimum number of complex operations on site, where poor weather and difficult environmental and ground conditions can make work more difficult. When the prefabricated components are delivered to Sobacken, Uponor Infra’s field service is called in to perform the welding and installation. With prefabricated components, the installation can be completed safely and quickly, saving both time and money. From the very first drawing to the completed installation, the process was controlled by a project manager from Uponor Infra. He was also onsite at Sobacken at least once a week, to check that Uponor Infra was fulfilling its commitments and to ensure that safety margins and quality requirements met.
Projektinformation
Projektinformation
Partnere
- The choice of Weholite as a solution compared with traditional solutions as stainless steel or concrete is the flexibility and that Weholite is easy to handle and install, says Risto Lindberg, project leader at Tage & Söner.
- For us it feels very safe to have a project manager with supervision of the whole solution, concludes Risto.
Contractor: Veolia Water Technologies AB
Sub-contractor: Tage & Söner
Installer: Uponor Infra Project Services
Lignende projekter
Plast sikrer kondensfri udluftning på ny hospitals- og forskningsenhed
PE-pumpebygværk sikrer stormflodssystem lang levetid
Barrier PLUS sikrer Thisteds borgere rent drikkevand
Fjernkølingsløsning i Københavns Havn
Stuksvejsning af ø900 by night sikrer stabil drift ved etablering af fjernkølingsløsning i Københavns Havn.
En nem og pålidelig regnvandsløsning
Det nye laste- og parkeringsområde på Volvos centrallager i Vantaa skulle asfalteres, hvilket krævede en pålidelig løsning til effektivt at kanalisere regnvand væk fra området. Uponors nye IQ-infiltrationsrør blev valgt som løsningen til at infiltrere og tilbageholde regnvand på grunden.
Testinstallation af infra-tunnel med stort potential
Unikt design sikrer kontrolleret afledning
TV-Tower, Estonia
PE pressure sewer system from Harjavalta to the city of Pori
New Uponor IQ –Storm water system - Sustainability and Quality in Road Infrastructure
Ultra Double replace concrete pipe line in Raahe
ProFuse pressure pipe line provides drinking water to cottage owners in islands near by Uusikaupunki
Environmental friendly heating and storm water systems in new Launonen day-care centre
Now that’s truly FAST
Secure tunnel trunk lines
Life is grand for graylings in the pure waters of Ounasjoki River
Europe’s largest ever plastic culvert goes to Norway
Don’t count on luck to protect you from flooding
Clean drinking water for 17,000 scouts
Iisalmen Vesi renovated a trunk line by relining
To rebuild an office building located in the heart of Amsterdam into 150 appartments in a relatively short time is definitely a big challenge.
Handling storm water in a smart way
Urban runoff under control – quickly and easily
Relining to the rescue in Kajaani
Weholite limits overflows and pollution in London
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Sewage pipelines to sewage treatment plant - HDD method
Collectors for sewage treatment plant
Renovation of reinforced concrete sewer - relining method
Sewage retention chanel
Renovation of cast iron water supply pipeline - swagelining
Thanks to swagelining technology, it was possible to carry out most of the water line modernisation works in the centre of the city of Łódź, in a built-up area, along traffic lanes with heavy traffic of motor vehicles and trams.
Sea outlet - discharge of stream water into the Gdańsk Bay part 2
Renovation of damaged stoneware collector – cracking/short relining
Sewage separation system
Construction of storm water collectors in Nowe Polkowice is one of the stages of a big investment concerning the drainage of the district.
Sea outlet of treated wastewater
A sea outlet of treated wastewater was initiated in Swarzewo. It is yet another of the many environmentally friendly projects that have recently been carried out in Poland where PE pipes were used.
Uponor pressure pipe system Profuse in Borås town
Uponor Infra culverts in major investment at Skåne University Hospital in Malmö
Strong, Safe and Flexible
Innovative, reliable - and installed in 11 days
Uponor soil drainage system Ultra Rib 2 in Kungälv
Infratunnel protects pipes and cables in new residential area
Weholite installed in Valdemarsvik Sweden
Uponor Vault cleans the storm water
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.
Flow measurement reveals leaks in the water supply network
Fire wastewater safely recovered
Safe and Sustainable
Water treatment plant
Quick installation in the Konotopa channel
Super-sized cooling
Weholite tanks have multiple uses
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.