Industri

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.

Industri

A durable and reliable solution for wastewater

The Weholite tanks, with an inner diameter of three metres, delivered to the Riihimäki wastewater treatment in Southern Finland will ensure that the plant keeps running, even during emergencies.

Etagebyggeri

Small group home gets its own Clean II -wastewater treatment plant

The biochemical batch treatment plant Clean I has been serving residents of detached houses for more than 15 years. Clean II, which was launched in spring 2023, uses the same technology to purify twice as much water. It can therefore be used by, for instance, two detached houses. Clean II has been installed at a small group home in Hollola.
Transportanlæg

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.
 
Transportanlæg

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.

Kommunalt byggeri

Ultra Double replace concrete pipe line in Raahe

The old concrete pipe line in Raahe came to its end. The replacing pipe line was made of Uponor's newest sewer system, Ultra Double.

Transportanlæg

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.

Kommunalt byggeri

Super-sized cooling

About 1 km of Weholite pipes were installed in Philippines as cooling water intake and outfall pipelines for the Petron Bataan Refinery (PBR).  The Project Service team at Uponor Infra offered a turnkey solutions for the project.

Landbrug

Båtstø enters a new age

The village of Båtstø in Hallangen, Norway, is stepping boldly into a new era of green self-sufficiency. More than two hundred of its homes have now been connected to the village’s very own brand new communal wastewater treatment plant.

Industri

Record-breaking intake cooling system in the Philippines

New challenges are where the Project Services Department at Uponor Infra feels most comfortable and can demonstrate its
continuously developing expertise. The aim on this occasion was to provide a seawater intake cooling system – a pipeline, intake structure and chlorination line – for the 420MW extension of the Pagbilao Coal Fired Power Plant on Luzon Island in the Philippines.
Land- & skovbrug

Delivery of fish farming pipes under harsh conditions in the North Atlantic

Challenging environment - high standards for the solution

Challenging weather, demanding underwater conditions and logistical challenges in remote areas of the North Atlantic create the harsh working conditions confronting the Danish salmon industry. That is also why a Faroese producer of breeding rings, KJ, sets high standards for its supplier´s solutions.

Easily handled pipes are essential when producing breeding rings at the site where they will be used. Whether the rings are to be used in the Faroe Islands, Shetland Islands, Iceland or the United Kingdom, the related large pipes need to be moved easily, due to difficult access roads and limited welding space. That is why it is so crucial that they are light.