Reference

The Mercian Broad, Birmingham, United Kingdom

Uponor ensures hygienic water for Birmingham’s tallest residential tower

Located on Birmingham’s busiest street, Broad Street, this building will become the tallest residential tower in the city when it opens in 2022.
Owned and operated by Moda Living, The Mercian has been designed to offer a high-end lifestyle for every resident. This is illustrated by the fact that the 42-storey site includes a 200-metre rooftop running track (one of the first in the UK's housing market) as well as shared lounges, health and wellness zones, virtual sports simulators and a dining club featuring a demonstration kitchen.
The plumbing solutions needed to match the luxury high-rise’s commitment to quality and ensure that a reliable supply of hygienic water would be provided to each of the 481 for-rent apartments at all times.

Projektfakta

Birmingham, United Kingdom
Etagebyggeri
Præisolerede rørsystem, Brugsvand- og varmesystem MLC
Færdiggørelse: 2021
Antal etager: 42

Uponors rolle

Based on previous successful projects, Moda Living and M&E contractor Imtech specified a number of Uponor’s solutions to ensure a high quality water supply at Birmingham’s new, 42-storey The Mercian residential tower.
The bathrooms within the development were all constructed using offsite methods. Using Uponor’s products within the bathrooms and in the building’s corridors made it quick and easy to connect the bathroom pods once they’d been craned into position.
Uponor’s multilayer composite (MLC) pipes were chosen as the pipe’s design would protect the water’s hygienic integrity by stopping oxygen getting into the system and by making sure that the water would flow at a fast, unimpeded rate.

Uponor ensures hygienic water for Birmingham’s tallest residential tower

Design, specification and construction
The Mercian has been designed using offsite construction methods, which includes manufacturing each apartment’s bathroom as a pod that is transported to site and then craned into position. Within each bathroom pod, all of the pipework was Uponor’s pre-insulated, multi-layer composite (MLC) system. This was chosen thanks to the design, installation and water quality advantages it would provide.
Both Moda Living and the M&E contractor, Imtech, were aware of the benefits of using Uponor’s MLC pipes thanks to its successful use at a number of previous projects. This past experience was an important factor in the specification process, as it meant that Moda Living could rest assured that the water network would not cause any issues once the site was operational.
Initially, the project design considered using MLC pipes in combination with PE-X pipes, however, the familiarity with MLC as a material combined with the fact that it provides extra protection via an oxidation barrier meant that MLC was exclusively used. The oxidation barrier prevents oxygen from entering the system, which can adversely affect the water. Pre-insulated MLC was also chosen over un-insulated alternatives due to the time that would be saved during installation.
MLC pipes consist of a core of aluminium, layered inside and out with polyethylene, which means they have a smooth internal surface. This improves flow rates and reduces friction losses to maintain pressure and ensure a good flow of water at the outlet.
In total, The Mercian will utilise more than 40,000m2 of Uponor’s MLC pipes in 16mm and 20mm sizes. The two sizes were used to make sure there was a consistent flow rate across the site, as smaller appliances such as taps require the 16mm pipes and larger appliances such as showers require the 20mm pipes.
Uponor’s innovative S-Press PLUS connections were also used to increase water flow onsite. These high-performance press fittings have an increased bore size compared to traditional connections which means that they don’t restrict the pipe size and create pinch points at the joints.
As the project was engineered offsite, Uponor’s design services were required to help ensure that the bathroom pods would connect to the building without any issues. Both the pod and heat interface unit located above every apartment in the corridor used Uponor’s products.
Using Uponor solutions for every pipe required for the apartments created a continuity of supply and avoided the potential design clashes that can occur when switching between materials. Having only a single source for all the apartment’s pipes also streamlined the process for the developer, as there was only one supplier they needed to communicate with.
Onsite, Uponor provided training to the installation team so that they knew exactly how to work with the MLC pipes. This training was certificated, to prove that the installers were up to the standard required to deliver a high-quality project. In addition, Uponor’s expert team was on-hand throughout the project to offer advice and attend site when necessary as well as quickly react to any changes in supply requirements.

Benefits
  • The design expertise Uponor provided ensured that the plumbing installed during the offsite construction of the bathroom pods would work seamlessly with the rest of the building’s pipework.
  • Uponor’s MLC pipes maintain a hygienic, high-quality water supply thanks to the oxidation barrier which prevents oxygen entering the system and the smooth internal surface that improves the flow of water.
We used Uponor MLCP on this project as we have found it to be ideal for installation in sealed ceiling and wall voids where the omission of joints has been a primary concern. It is a sturdy product but versatile enough to bend in situ without deforming and as such has aided in managing the time periods for first fix installation. Uponor were quick to provide any technical assistance needed throughout the project.

Uponor has supplied high-performance plumbing solutions for The Mercian.Paul Farmer, Mechanical Engineer, Imtech

Projektinformation

Projektinformation

Land
United Kingdom
Færdiggørelse
2021
Projekttype
Renovation
Bygningstype
Etagebyggeri
Produktserier
S-Press PLUS

Partnere

Partnere
M&E contractor:
Imtech 
Client:
Moda Living 
Architect:
Glen Howells Architects

Lignende projekter

Sluseholmen

Sluseholmen

Uponor kan nu berige markedet med nyudviklede, præfabrikerede VVS-skaktenheder, som giver en række indlysende fordele i moderne etagebyggeri og rækkehuse. Det var arbejdet med projektet Sluseholmen i Københavns Sydhavn, som gav indsparket til idéen om et helt nyt, kompakt og fleksibelt modul til styring af vand og varme i forskellige boligtyper.

 
Skyhouse

Skyhouse

Witness the premium customer experience during this hands-on support as this Austin Texas apartment complex converts...
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
Underfloor cooling adds value to new construction

Underfloor cooling adds value to new construction

Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.
Stylish rock home was renovated with practical viewpoint

Stylish rock home was renovated with practical viewpoint

Sipe Santapukki's appartment in the small multi story building that was built in 1930's was renovated thoroughly. Practicality, intimacy and energy efficient were the starting point for the renovation. Uponor's underfloor heating system and Drain gully system was chosen for the renovation.
A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
New apartment building

New apartment building

Two blocks of rental flats were completed at Sokeritehtaantie 15 in Kirkonummi in summer 2015. The new sites were realised with Uponor's R2i elements.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Next stop: comfort

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.
Grand Tower

Grand Tower

More than 400 heat interface units and over 300 km of underfloor heating and cooling pipes for Germany’s highest residential complex.
Sampo Ltd multistorey building renovation

Sampo Ltd multistorey building renovation

Sampo plc has chosen the Uponor technical wall as the solution for the renovation of the damp areas in several blocks of rental flats. The project is expected to run from March 2015 to February 2017. There are a total of 150 flats at the sites.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Riverstone Residence

Riverstone Residence

Multi-storey building in Kipsala in the historic centre of Riga and UNESCO World Cultural and Natural Heritage Protection Zone.
Avalon Bay

Avalon Bay

Six new apartment buildings, originally designed for CPVC, become a PEX project and include an Uponor Logic...
Tellico Village

Tellico Village

A recurring problem with pinhole-sized pipe leaks in copper required plumbing repair and repiping. Learn why the...
Aurora Micro Apartments

Aurora Micro Apartments

Learn why contractors chose to install an Uponor AquaPEX® plumbing system for these apartments based on product reliability and ease of installation...
Fairway Village

Fairway Village

Learn how the challenge of replacing 45-year-old underground plumbing, heating and cooling system in an...
Quail Hollow

Quail Hollow

See how a condominium complex replaces their leaking steel-pipe district energy system with Uponor’s Ecoflex pre-...
Loring Park Tower

Loring Park Tower

See how this Minneapolis Mechanical Contractor witnessed significant decrease in jobsite labor during Uponor PEX...
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Omniturm Frankfurt

Omniturm Frankfurt

Premium technology for premium apartments with nearly 150 heat interface units for an individual room climate.
 
Episcopal Homes

Episcopal Homes

Uponor PEX saves time and labor on this multi-resident Midwest Senior Living home job in Burnsville, Minnesota...
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
hi! Cañaveral

hi! Cañaveral

hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.

Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.