Modernization of the lock on the barrage, Krapkowice, Poland

Krapkowice barrage - reliable PE pipes on the modernization of the lock

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.

The aim of the investment "Modernization of the lock and the control room on the Krapkowice barrage along with the reconstruction of outer harbors", implemented by PGW Wody Polskie Regional Water Management Authority in Gliwice, is to improve and ensure navigation on the Oder Waterway. The investment includes the construction of a new lock chamber with a length of 190 m and a width of 12 m with equipment. As part of the construction works, the existing draft chamber will be reconstructed, which will guarantee the continuity and safety of navigation, and the waterway from class III will be upgraded to class V navigability. A siphon culvert for the Sonia River will also be built under the outer ports of the main locks to drain water from the nearby polder. This arrangement will increase the flood safety level. The construction cost of the new Krapkowice lock is over PLN 209 million, most of which comes from the EU Operational Program Infrastructure and Environment 2014-2020.

Projektfakta

Krapkowice, Poland
Väg & Järnväg
Designade lösningar
Färdigställt: 2023

Uponors roll

Weholite pipes PE100 DN2000 SN8 - 186,4 m as well as special fittings and segmented bends
Extrusion welding of Weholite pipes by the Uponor Infra Service Group using the WL-3000 automatic extrusion welding machine

Weholite siphon culvert

The investment includes the construction of a new main chamber and the reconstruction of the existing draft chamber. A siphon culvert under the Sonia River will also be constructed to drain water from the nearby polder. In order to guarantee the required flows, parallel Weholite DN2000 SN8 polyethylene pipelines were designed. Weholite pipes are commonly used in demanding areas, such as floodplains and mining damage.

A double line of the Weholite siphon culvert under the bottom of the Odra River

Hydrotechnical investments are complex and advanced engineering projects, carried out in difficult soil and water conditions. That is why it is so important to choose experienced contractors and proven materials for their implementation. In the case of this investment, the contractor of the works is POM Krapkowice, and the supplier of materials for the construction of the double line of the siphon culvert is Uponor Infra - a company with over 70 years of experience in the production of PE and PP pipe systems. Uponor Infra is known for the implementation of technically advanced engineering projects. She has participated in many prestigious investments, often record-breaking in terms of the parameters of the pipes used. For the investment in Krapkowice, the company supplied Weholite PE100 DN2000 SN8 pipes with a length of 186.4 m, as well as large-size special fittings and segmented bends.
 
Polyethylene pipelines are completely resistant to corrosion, fouling and chemical factors, including changing pH of water and soil. Light elements are easy to unload and install. Thanks to their flexibility and perfect cooperation with the ground, they are resistant to terrain impact, which is why they can be used in difficult ground and water conditions, as well as in floodplains and areas of mining damage up to category IV inclusive. Excellent material properties of polyethylene pipes and assembly of elements by extrusion welding is a guarantee of 100% tightness of the system and transfer of all axial forces. The method ensures a homogeneous connection, full control and a high safety margin in the case of difficult working conditions. As a result, the service life of pipelines exceeds even 100 years.
 
The double line of the siphon culvert was installed under the bottom of the Oder River using the open trench method. The connection of the pipeline sections was made by the Uponor Infra service group using the WL-3000 automatic extrusion welding machine. The scope of works related to the siphon culvert included the construction of sheet piling, excavations in the cofferdam, construction of the foundation, laying of pipelines with manholes and construction of the inlet abutment to the culvert and the outlet of the culvert.
Completion of the investment at the Krapkowice barrage is planned for the third quarter of 2023.
 

Modernization of the lock on the barrage

Modernization of the lock on the barrage

Projektinformation

Projektinformation

Land
Poland
Färdigställt
2023
Byggnadstyp
Väg & Järnväg

Samarbete

Samarbete
Investor:
PGW Wody Polskie Regional Water Management Authority in Gliwice

Contactor:
POM Krapkowice

Liknande projekt

Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Ice-free pavement throughout the year in Lahti

Ice-free pavement throughout the year in Lahti

The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.
Retention systems for the S3 expressway

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
Storm water of the railway station

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks
Retention tanks in mountain areas

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.
Retention tanks for the multimodal terminal

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.